08-17-2008, 12:59 AM
We got the tub from Keith's house to mine this morning and got it ready to go on the frame. There were a few last minute things we had to get done on the frame before lifting the tub - more clamps on the brake a fuel lines, cut the t-case shift rails for the twin stick shifter, and redneck trac-bar (two ratchet straps since we have not welded a trac bar in yet - waiting on final ride height first).
This is the first time that the chassis has been rolled so far as out of the garage in over a year and even longer since the frame has seen daylight! upergrin:
Here are some pics as we are about to get ready to lift the tub onto the chassis.
This is the first time that the chassis has been rolled so far as out of the garage in over a year and even longer since the frame has seen daylight! upergrin:
Here are some pics as we are about to get ready to lift the tub onto the chassis.
'74 Grocery Getter, '73 Project Buggy, '77 Parts Rig