03-02-2010, 01:45 AM
tore into it today
started tearing the bad stuff out. it is going to take a few days to dry everything out. these things are put together half assed and backwards. the cabnets are stapled to th wall from the outside. like before they closed it in. got the bed and bedside cabnets removed. tore up the floor in there. also opend up the slide, removed the couch. took off one layer of osb to get to the rotten stuff. also pulled some of the kit cabnets up so i could get the floor up and get it drying. the membrane on the bottom was holding a lot of water and so was the insulation. got most of the bad areas opened up.
started tearing the bad stuff out. it is going to take a few days to dry everything out. these things are put together half assed and backwards. the cabnets are stapled to th wall from the outside. like before they closed it in. got the bed and bedside cabnets removed. tore up the floor in there. also opend up the slide, removed the couch. took off one layer of osb to get to the rotten stuff. also pulled some of the kit cabnets up so i could get the floor up and get it drying. the membrane on the bottom was holding a lot of water and so was the insulation. got most of the bad areas opened up.
Eric. :rebel: