03-18-2010, 05:36 PM
I got the other wall fixed insulated and covered with ply. built the cabnet for the furnace access fridge, and shelf on top. it came out pretty decent.
first mistake also. i cut a 1/2 water line. cb has the crimpers for the pek stuff so its all good. sealed up most of the fridge cabnet for fumes etc . i cut out for the outside shower also.
first mistake also. i cut a 1/2 water line. cb has the crimpers for the pek stuff so its all good. sealed up most of the fridge cabnet for fumes etc . i cut out for the outside shower also.
Eric. :rebel: