04-29-2010, 09:27 AM
a quick update....
little work on the cabnets
braced insulated and closed up the bathroom wall and reinstalled the tub/shower
All systems except the stove are hooked back up. Water is on to it no and testing the waterheater. No leaks yet. All elec systems are rodger. Fridge works. Ac works. Gotta cut out for the stove and install that then test the lp gas system.
Water heater works and no leaks yet. I think I'm going to tile the countretop. Mosaics probably. I got some stone finish paint I'm going to try for the cabnets. Ill do a test piece to see if I like it. Still gotta finish the sink cabnet first.
Firsr coat with the texture paint
little work on the cabnets
braced insulated and closed up the bathroom wall and reinstalled the tub/shower
All systems except the stove are hooked back up. Water is on to it no and testing the waterheater. No leaks yet. All elec systems are rodger. Fridge works. Ac works. Gotta cut out for the stove and install that then test the lp gas system.
Water heater works and no leaks yet. I think I'm going to tile the countretop. Mosaics probably. I got some stone finish paint I'm going to try for the cabnets. Ill do a test piece to see if I like it. Still gotta finish the sink cabnet first.
Firsr coat with the texture paint
Eric. :rebel: