01-16-2011, 08:36 PM
Keith and I got to work on the orange beast some yesterday and today. Pics can't really show what has been done since the last pics posted, but here are a few I took today. The wiring is 98% complete and the dash is bolted in, we had to fab a mount for the coil since there are no inner fenders, the heater hoses/water pump hoses, by pass hoses, are all connected, vacuum lines are done/plugged, and the longer art carr shifter cable is installed.
Still need to button up some loose ends on the fuel lines, install radiator and trans cooler, distributor, and oil and it's time to crank!
Still need to button up some loose ends on the fuel lines, install radiator and trans cooler, distributor, and oil and it's time to crank!
'74 Grocery Getter, '73 Project Buggy, '77 Parts Rig