08-30-2011, 03:43 PM
(This post was last modified: 08-30-2011, 03:52 PM by broncosbybart.)
For Chuzie's rig, it could be something that we could do in a day. I have a set of 44 setup bearings that I made a while back. If someone could set up the 9" gears (a lot easier to do) while I was working on the front, it could be knocked out in about 1/2 of a day. Nothing much could get done while the gear work was being done though. Perhaps working on a 2nd rig, like Doug's, could happen during that time. it wouldn't be too hard to do the drum brakes and ps stuff. the trans on the other hand would be a pretty big job.
Any and all feedback/input is welcomed! I do know that Asiel is no good for the 1st
I sent out a mass pm on it. been getting some good input. keep it coming!!!
Any and all feedback/input is welcomed! I do know that Asiel is no good for the 1st
I sent out a mass pm on it. been getting some good input. keep it coming!!!