10-05-2013, 09:41 PM
While I was there, I filled all the holes in the bed and floor sections that will not be used and smoothed some of the other welds done by a previous owner. The interior and underside of the tub will be lined and what is remaining of the existing liner in the interior will be removed.
After that, I finished the outer rocker panel work and cut straight and smoothed what was left of the inner rockers. The original 2x6 rock skis that were on it will be fastened directly to the frame and will protect the body tub along these areas. I did the 1x1 square tube for looks and to strengthen the door sills. Hopefully the pics will make sense of it all.
After that, I finished the outer rocker panel work and cut straight and smoothed what was left of the inner rockers. The original 2x6 rock skis that were on it will be fastened directly to the frame and will protect the body tub along these areas. I did the 1x1 square tube for looks and to strengthen the door sills. Hopefully the pics will make sense of it all.