07-24-2014, 03:08 PM
Ok just got my new compressor new to me at least finished hooked up. Only down fall is it is on the other side of the basement so gotta run air lines along the floor a good chunck of the way till I get something more permanent set up. I was able to take a 25ft air hose I have and run it from compressor and up through floor joist to the beam down the middle of the basement and a little ways. It is also a heck of a lot quieter then my other one. Got the regulater installed so I don't blow out any air tools also. It is a 3.6hp with 11.8cfm @90psi max operating psi 155 charge psi is 125. It looks pretty new so that is good. It is an industrial air 60gal.
Also got some holes drilled in a piece of stock that I have that I will slide into my engine hoist to be able to pic things up off the ground without having to roll under them. Basically fixing my idiot move of setting one of my boddies or tubs directly on the ground.
I will be picking standoffs up when I head back up to TN next friday witch will allow me to set a body on the frame and on rotisserie and spin it while I drill or grind spot welds out to replace the floor pans and other rotted metal.
Also got some holes drilled in a piece of stock that I have that I will slide into my engine hoist to be able to pic things up off the ground without having to roll under them. Basically fixing my idiot move of setting one of my boddies or tubs directly on the ground.
I will be picking standoffs up when I head back up to TN next friday witch will allow me to set a body on the frame and on rotisserie and spin it while I drill or grind spot welds out to replace the floor pans and other rotted metal.