07-24-2014, 10:36 PM
That is kinda funny the timming of your comment as I was thinking CPVC when I was readding Crawdads comment just now. I currently have a typical 25' line from sears running from compressor to beam down middle of basement just want something to go from there down about 20 feet maybe a bit less to a spot I can set a T up and work off of as I have a real and 100" hose I will hook up there think it is a 50" reel. But the real fun begins replacing the 1/4 fittings with 3/8, tell me if this thinking is crazy as I was thinking once I get the pipe down to my T to split it off for different lines to tools, I was thinking leave one or 2 1/4 and leave all my tools I currently have like impact, air wratchet and air chisel on the 1/4 but have a connection for 3/8 for sand blasting and painting and all the connections from there to the compressor be 3/8 as well. Or should I just switch everything over?