07-07-2015, 12:03 AM
Got the under side of the tub all done. I had to modify the floor pan on the pass side to make room for the exhaust downpipe. Then I fixed the hacked up cross members and trans tunnel. Then came fitting the shifter for the Atlas 4 speed range box and then finally the twin sticks. I ended up using some 1/2 stainless round stock for the shifter levers on the twin sticks and welded it all up. They are embedded about 1/2" into the lower square portion of the arms.
Finally came fabbing up a cover for the shifters/trans tunnel. Still have to mount the shifter boots but that is minor.
Body is back down and I got the steering col mocked up and cut the lower shaft to length. Next up is the intercooler and radiator mounting and plumbing.
Finally came fabbing up a cover for the shifters/trans tunnel. Still have to mount the shifter boots but that is minor.
Body is back down and I got the steering col mocked up and cut the lower shaft to length. Next up is the intercooler and radiator mounting and plumbing.