11-22-2015, 11:07 PM
Not even sure where I left off. All the brake lines are cut, flared and run. Bleed out and working. The engine bay is mostly done. All the gauges are installed. Door are assemble with new key cylinders. Took a ton of time to find a good condition door latch to use. I think I put the doors together 5 or 6 times each till I had had a good working set. Got the spare mounted but have run into problems with the tool box I planed for the drivers side. So I may go back to the backpack tool bag so it will clear the spare tire. Seats came in. I went with a black and gray combo with a neoprene covering. Of course one seat came in with the wrong color. So before I can mount them and the consul they all need to be here.
Next is the wiring work. Will be slow going for a while.
Next is the wiring work. Will be slow going for a while.
[SIGPIC][/SIGPIC]