01-05-2011, 05:10 PM
The footing guy just left. He dug up all my stumps for me. They laid out the footings and began digging, then uncovered 2 of my septic tag lines.
So for now he back filled the holes and the contractor has a call in to the septic people. Looks like I'm going to have to terminate these two lines then add two more across the bottom of the yard. After that maybe we can get some concrete in the ground.
So for now he back filled the holes and the contractor has a call in to the septic people. Looks like I'm going to have to terminate these two lines then add two more across the bottom of the yard. After that maybe we can get some concrete in the ground.
'72 TBA...