02-16-2012, 01:55 PM
So, ive got just under half a year left before i can get back to Sick Pony, and finish her off. Hopefully the parts list is complete, and she will be on the road shortly after my return. That being said, i may need to have a wrenchfest/turn n' burn type deal to ensure this... Here are some of the biggies that need to get done...
Finish refurbing the Half Cab i got (a good bit of fab work)
Build custom half cab bulhead to work with my cage (even more fab work)
Install Headers, and Exhaust
Install Power Steering conversion including shaft
install power brake booster and bleed everything
install entire fuel system
reupholster two stock buckets
finish up loose electrical connections(not much, but may need a properly wired stockish bronco to get it right)
Install entire cooling system and fill
Install Windows and seals in doors
Thats pretty much it, other than surprises(which I expect)
So, this is really just a feeler, none of the required parts have been purchased yet, but will be waiting on me upon my return... Who's interested? I'm willing to supply Beer adn 2 meals, and some recreational BS n' Brews afterward!
I know after this event, i will still have bugs to work out before driving her to URE, so i wanna get her at least running and roadworthy so i have a couple moths for any surprises to present themselves before the trip.
Post up with comments and suggestions! BTW it needs to be sometime between late July and September 1st... eeeessh! sorry!
Finish refurbing the Half Cab i got (a good bit of fab work)
Build custom half cab bulhead to work with my cage (even more fab work)
Install Headers, and Exhaust
Install Power Steering conversion including shaft
install power brake booster and bleed everything
install entire fuel system
reupholster two stock buckets
finish up loose electrical connections(not much, but may need a properly wired stockish bronco to get it right)
Install entire cooling system and fill
Install Windows and seals in doors
Thats pretty much it, other than surprises(which I expect)
So, this is really just a feeler, none of the required parts have been purchased yet, but will be waiting on me upon my return... Who's interested? I'm willing to supply Beer adn 2 meals, and some recreational BS n' Brews afterward!
I know after this event, i will still have bugs to work out before driving her to URE, so i wanna get her at least running and roadworthy so i have a couple moths for any surprises to present themselves before the trip.
Post up with comments and suggestions! BTW it needs to be sometime between late July and September 1st... eeeessh! sorry!
My Build Thread-
http://www.carolinabroncos.com/forums/sh...php?t=3919
You're gonna have to be more specific... 11/12/11
http://www.carolinabroncos.com/forums/sh...php?t=3919
You're gonna have to be more specific... 11/12/11