Got the rest of the bad floor tore out. found out there is an outside shower! sweet. i cut off the lower portion of the back to repair some stuff. i have one or two more areas to cut out and i think i got to all the rotten wood. I need to remove the slide soon. maybe after it gets done raining on thurs or friday. sooner if i had some help to get it out. I also started removing the interior paneling about 22" up from the floor. I want to add aditional stringers of wood at the top of where the diamond plate will be on the outside and double up the studs where two pieces are going to meet. its slow going at this point. i have to clean everything up good. what really sucks is they ran the flooring under the exterior side walls so im going to have to clean all that out well and do something else. I dont think it will be too bad once i get it all out and can start rebuilding it. I actually spent 111 at lowes today for supplies. first money i have spent on it so far.