03-30-2010, 10:26 PM
thanks guys. progress has been a little slow but thats gonna change come pay day!!
Eric. :rebel:
The Love shack
|
03-30-2010, 10:26 PM
thanks guys. progress has been a little slow but thats gonna change come pay day!!
Eric. :rebel:
03-31-2010, 04:08 PM
i fastened all the DP on today temporarly. checking fit etc. I pre drilled all the holes and ran 1" drywall screws in. this pre drills tha holes in the wood and when i pull it all off to seal it i can put caulking in the hole and under the screw. it all fit real well. i have to cut out for the furnace and trim one back piece but thats it. i also will eventually do the doors as marked and probably the pass thru doors.
Eric. :rebel:
04-04-2010, 08:52 AM
bone collector Wrote:all its missin is some SPINNERS LOL BLING BLINGon order......NOT. lol
Eric. :rebel:
04-05-2010, 12:40 PM
got a few things done. got slider mounted and operational and put the rest of the trim on it. i pulled out the awning to look at it and let it air out. i am missing a leg on it and one of the feet are broken. i got all the DP mounted on the drivers side. I sealed and mounted the electrical inlet flange and the phone and 2 cable hookups. i mounted the pass thru door and figured i would try my luck with running a bead around it. it came out good. I used to work with silicone a lot and was pretty good at running beads but you loose it if you dont do it. i also went ahead and sealed the top and 1st seam of the DP. came out really well im happy. i got one side of the slide done and am about to go eat then start the other side of the slide. i would like to get all the DP mounted and sealed today.
the piece at the top i am missing from the other side. this is the foot of the awning. it is supposed to have a piece between the arrows thas broken
Eric. :rebel:
04-05-2010, 07:23 PM
except the corner and bottom angle, the passenger wheel well trim, furnace install and clean up the outside is about done. all the DP is on and sealed
Eric. :rebel:
04-05-2010, 10:34 PM
Man you do some jam up work. Keep up the good work.
04-05-2010, 11:03 PM
thank you sir. i got a few hrs to tighten it up on the outside. install furnace, remove stickers from storage doors and slide frame. remount awning feet. I have to get one more sheet of DP for the front also. i need to start cleaning up and packing. im moving back to Mcbee by may 1
Eric. :rebel:
|