02-01-2015, 11:34 PM
The next workday will be Feb 21. For those that have expressed a desire to help out in Feb or March, can you post up with a definite on when you plan to come? We have a fair bit of work to do in 2 workdays. It is doable but we will just need to plan things out in advance. Hopefully the weather will cooperate for the remaining winter workdays. Looking forward to getting out there and getting some work done and having some fun as well!
Tools needed will be a battery powered cutoff wheel (Clay?)
Couple shovels (I'm good for 1)
Couple of large crow bars (I'm good for 1)
We could probably use a few wheel barrows too.
Again, the plans are to tear out the large wooden crossing nearest the hill climb. It is in a bit of a gully. We have re-constructed the 'bridge' a few times now but the plan is to remove it and fill the stream crossing in with loose rock. There isn't a ton of rock in the immediate area. We could probably use 1 rig dedicated to running to the base of the hill climb and gathering rock from there and bringing it to the stream crossing. There should be enough rock between that spot and immediately near by the stream crossing to fill it in.
Tools needed will be a battery powered cutoff wheel (Clay?)
Couple shovels (I'm good for 1)
Couple of large crow bars (I'm good for 1)
We could probably use a few wheel barrows too.
Again, the plans are to tear out the large wooden crossing nearest the hill climb. It is in a bit of a gully. We have re-constructed the 'bridge' a few times now but the plan is to remove it and fill the stream crossing in with loose rock. There isn't a ton of rock in the immediate area. We could probably use 1 rig dedicated to running to the base of the hill climb and gathering rock from there and bringing it to the stream crossing. There should be enough rock between that spot and immediately near by the stream crossing to fill it in.