04-23-2012, 08:41 PM
Got the 74 EB in January,
Added 2 1/2 " JBG springs thanks to Dixieboy at the M&G, just what the doctor ordered. Then installed add a leaf for now to level it.
Installed new extended brake lines and 76 F250 Mstr cyl to get the Disk fronts to work. Cleaned and undercoated underside and frame. installed new gas lines and filters. Last Friday night snatched out the front-end and installed new C-bushing, radius arm bushings. New shocks. Ordered extended track bar should be here in a day or two. Also found 302 power plant to stab soon. It'll need timing chain & gears, oil pump and pick-up tube and new pan. Removed cleana nd re-wrapped the wiring fornt to back. Dropped tamka and install new float and pick-up. Oh yeah cleaned , chacked and repacked hubs.
Got some greasy jeans and shirts, but aint this fun...
DirtyWhiteBoy
Added 2 1/2 " JBG springs thanks to Dixieboy at the M&G, just what the doctor ordered. Then installed add a leaf for now to level it.
Installed new extended brake lines and 76 F250 Mstr cyl to get the Disk fronts to work. Cleaned and undercoated underside and frame. installed new gas lines and filters. Last Friday night snatched out the front-end and installed new C-bushing, radius arm bushings. New shocks. Ordered extended track bar should be here in a day or two. Also found 302 power plant to stab soon. It'll need timing chain & gears, oil pump and pick-up tube and new pan. Removed cleana nd re-wrapped the wiring fornt to back. Dropped tamka and install new float and pick-up. Oh yeah cleaned , chacked and repacked hubs.
Got some greasy jeans and shirts, but aint this fun...
DirtyWhiteBoy