04-12-2014, 09:14 AM
Thanks Bart! I got it down to 1/8" of an inch difference side to side. Best I could get it. Floor and inner rocker is all the way welded in now. Getting ready to finish welding the kick panel, door post and outer rocker. Then I get to go to the other side!!!!!